TUSAŞ Completed AKSUNGUR UCAV Deliveries
Turkish Aerospace (TUSAŞ) delivered the last AKSUNGUR UCAV to the Naval Forces Command. The Turkish Defence Ministry (MoD) shared the relevant information.
Turkish Aerospace (TUSAŞ) delivered the last AKSUNGUR UCAV to the Naval Forces Command. The Turkish Defence Ministry (MoD) shared the relevant information.
Hypersonic missiles are one of the biggest threats against maritime vessels today. Russia continues to expand this capability.
After the mid-life upgrade, the Finnish Navy has accepted all four Hamina-class fast attack craft.
ARES Shipyard will continue to build ARES 35 FPB Multi-Role Patrol Craft for the Turkish Ministry of Interior, Coast Guard Command.
Poland adds a new ASW capacity to its Navy. On December 8, the Polish Navy received the first AW-101 Merlin helicopter.
Berkin Engineering renewed the French-origin data distribution systems of Seismic Research Vessel Oruç Reis. The ship is under the modernisation process.
The US approves the sale of 80 Mk.54 LWT light torpedoes to Germany for P-8A Poseidon aircraft, potentially costing $300m.
Russian ROSATOM announced that the second RITM-200 nuclear reactor for icebreaker Chukotka will be delivered to the shipyard by the end of 2023.
Norway has reportedly delayed the delivery of P-3 Orion aircraft to Argentina as Buenos Aires has not made the first instalment of the payment.
Two nuclear-powered and one conventional submarine have been delivered to the Russian Navy, with two more expected to be delivered by the end of the year.
Greece plans to modernise the MEKO 200 class frigates. Greek Defence Ministry has set the modernisation of the MEKO 200 frigates as a strategic goal.
The German Federal Ministry of Defence announced the start of production of the F-126 frigate from its social media accounts.
S-81 Isaac Peral submarine, the first of the S-80-class was commissioned by Navantia to the Spanish Navy.
The U.S. State Department has approved the sale of AUKUS-related training and training devices to Australia for an estimated cost of up to $ 2 billion.